tag. // // Some tips: // * Some application variables: // - Gallery Title: $gallery->app->galleryTitle // - Album Title: $gallery->album->fields["title"] // // $Id: album.header.default,v 1.17 2004/07/17 11:35:20 jenst Exp $ ?>
 2006-01-21 Upper Romero Canyon Maintenance 
The crew recovering materials used for building crib walls.
The crew recovering materials used for building crib walls.
Viewed: 362 times.

The crew recovering materials used for building crib walls.
The crew recovering materials used for building crib walls.
Viewed: 358 times.

The crew recovering materials used for building crib walls.
The crew recovering materials used for building crib walls.
Viewed: 370 times.

Original trailbed all but covered with slide material and vegetation. Six inches of trail left on outside edge of original trailbed.
Original trailbed all but covered with slide material and vegetation. Six inches of trail left on outside edge of original trailbed.
Viewed: 372 times.

Finished original trailbed. Trailbed is now 18
Finished original trailbed. Trailbed is now 18" (more in some cases) wide, with 3 degree outslope and a smooth backslope to allow water to sheet off smoothly. Low vegetation will soon grow in to stabilize slope and naturalize the work.
Viewed: 357 times.

Trailbed was covered by a slide.  After maintenance, it's back to a stable 18
Trailbed was covered by a slide. After maintenance, it's back to a stable 18" wide trailbed.
Viewed: 364 times.

Attaching tools to early guide pack frame!
Attaching tools to early guide pack frame!
Viewed: 343 times.

Attaching tools to early guide pack frame!
Attaching tools to early guide pack frame!
Viewed: 374 times.

After trailbed maintenance!
After trailbed maintenance!
Viewed: 396 times.

Powered by Gallery v1 RSS