The crew recovering materials used for building crib walls.
Viewed: 362 times.
|
The crew recovering materials used for building crib walls.
Viewed: 358 times.
|
The crew recovering materials used for building crib walls.
Viewed: 370 times.
|
Original trailbed all but covered with slide material and vegetation. Six inches of trail left on outside edge of original trailbed.
Viewed: 372 times.
|
Finished original trailbed. Trailbed is now 18" (more in some cases) wide, with 3 degree outslope and a smooth backslope to allow water to sheet off smoothly. Low vegetation will soon grow in to stabilize slope and naturalize the work.
Viewed: 357 times.
|
Trailbed was covered by a slide. After maintenance, it's back to a stable 18" wide trailbed.
Viewed: 364 times.
|
Attaching tools to early guide pack frame!
Viewed: 343 times.
|
Attaching tools to early guide pack frame!
Viewed: 374 times.
|
After trailbed maintenance!