Home | SBMTV Blog | Trails | Links | Calendar | Membership | Contact | SBMTV in the News | Board Meeting Notes | Graphics | Photo Gallery |

UPCOMING PROJECTS ON THE SISQUOC:

Join us as we continue our volunteer trail work effort on the Upper Sisquoc river trail. We have 2 weekends selected for May. The work area is from Skunk Camp downstream to the South Fork of the Sisquoc area.

It is our plan to backpack in on Friday, work Saturday and backpack out Sunday. The pack goats will pack in a complete BBQ meal for us for Saturday night, complete with beer on ice.

We have made excellent progress on the brushing of this trail in the 2 years since taking it on. I believe we have about 1 ‡ miles of brushing left to reach South Fork Station. The trip a couple of weeks ago was very successful we had 6 volunteers total and brushed out at least another 1/2 mile of trail, maybe more. The Upper Sisquoc is really beautiful this time of Year.

WHEN: May 6,7,8 and May 20,21,22

WHERE TO MEET: We will meet at the Ranger station in Santa Maria at 08:00 AM on Friday Morning and carpool to the trail head from there.

WHAT TO BRING: This is a backpack type trip, normal backpack type gear and sleeping gear is needed and whatever other personal items You would like. As mentioned above a complete meal will be provided for Saturday nights meal, You must bring food for the other meals. We have tools already at the work areas. Bring a good shade hat, pants and long sleeve shirt and sturdy shoes for the trail work, gloves will be provided. Also bring sunscreen and maybe insect repellant. Ticks and poison oak will be an issue so plan accordingly. Those susceptible to poison oak can avoid it and work other sections without the nasty stuff.

OTHER INFO: We will hike in 7.3 miles to Mansfield Camp or 8.5 miles to Skunk camp via the scenic Juddell Trail and Sisquoc River trails and set up camp. On Saturday we will walk downstream approx one hour to the work area. Due to camp size and wilderness impact considerations we are limited to approx 12 volunteers.

Any Questions e-mail or give a call
Mike Smith
Wk ph 605-1735
Hm Ph 733-2013

RATTLESNAKE Project:

Hi all,

Just to alert you. Our monthly Trails Alliance project is coming up soon, Saturday May 7th to be specific. We'll meet at Skofield Park at 9AM and work in the middle part of the canyon past the first creek crossing. Almost all of the work will consist of brushing but depending on what clearance we have from the SB District archaeologist we will be doing some tread work if possible too.

Hoping you can be there. Please wear long pants and shirts (there is poison oak), trail shoes and bring gloves, eye protection and a helmet (bike helmets work perfectly) if you have them though we will have extra gloves and helmets available too.

Also plan on bringing a lunch, water or other refreshments and lots of enthusiasm. We'll have water and Gatorade for you as well. If you have questions (or need directions to Skofield Park) please email me for more information at ray@sbtrails.org.


ELINGS PARK Trail Maintenance:

Saturday May 14th, 9:00am, Elings Park

SBMTV continues work on the new trails at Elings Park. We will be brushing and doing dirt work. Do a little maintenance and ride these great new trails afterwords! Bring long pants, helmet, sunscreen, water, and lunch. Tools supplied. More info soon at www.sbmtv.org



SBMTV 3rd Saturday Regular Trail Maintenance:

SBMTV continues it 10+ years of local trail maintenance the 3rd Saturday of each month. Trail location to be announced - please check back at www.sbmtv.org for location and more information.