- This event has passed.
Elings Park Trail Work – Saturday 1/23
January 23 @ 10:30 am - 1:00 pm
Event Navigation
El Nino is really taking it to the trails at Elings. While some sections are holding up others are severely rutted and in need of repair.
This Saturday we’ll be working on the Burro Trail which drops down towards Las Positas and Cliff from the bottom of Hang Glider Hill.
RSVP: [email protected]
Work to be done:
- improve drainage
- install rolling grade dips and drainage nicks
- de-berming
- creating outslope
Details:
- Date: Saturday Jan 23rd
- Time: 10:30am – 1:00pm
- Meeting Elings Park south lot (off cliff drive)
Provided:
- Instruction provided by experienced crew leaders
- tools, gloves, helmets
- lunch
Bring:
- your own helmet and gloves
- sturdy shoes
- water and a snack
+ Google Calendar+ iCal Export