- This event has passed.
Synder Trail work and Shuttle Jan 31st
January 31 @ 8:30 am - 2:00 pm
Event Navigation
We will meet at the bottom of Knapps / Schneider trail at the pull out parking lot on the right along Paradise Rd at 8:30.
Lots of rutts to repair and drainage to improve. Most of the work will be focused on S-Turns/Siwtch Backs. #ElNino
Bikes: will be shuttled to the top to ride down with pack able tools and bob trailers
Boots: will hike up from the bottom with tools.
Work:
-Enhance/Improve water control features
-De-berming
-Creating Outslope
Provided:
-Instruction provided by experienced crew leaders
-Tools, gloves, helmets
-Shuttle
-Lunch
Bring:
-your own helmet and gloves
-sturdy shoes
-water and a snack
-bike (if you wanna ride)
We’ll have lunch under the oaks off of Paradise Rd.
+ Google Calendar+ iCal Export